Monday, February 1, 2010

Frame No. 2 - 1

this is going to be a chronological series of posts throughout the construction of my second bicycle frameset. the frame planned is a 29" mtb, non-suspension corrected.

the first thing i did after drawer-ing up the geometry was drill the BB shell.

next i coped the seat tube. 1-1/8 x .035" 4130 straight gauge.
checking for fit.

2 comments:

aaron said...

She's a gonna be a beefcake. I've gotta get myself to your level of miter-skill before taking this process mainstream. Nice joint.

D n L said...

it all about the file. a 14" half round is perfect for the ST/BB miter.