Wednesday, October 7, 2009

another kona ute project

dropped off last saturday, by jesse and the family.

3/4" tube pierced by 5/16 x .049" tubes, making a nice solid thru-bolt mounting point.
other side
tacked into place.
once i get the rest of the cross pieces brazed in im gonna swing by my buddies house to start on the wooded portion of the rack. once we figure out what the dimensions of that part will be then i can proceed with building the rest of it.